Project Title
Construction of Manisa (Central) Wastewater Treatment Plant
Description of Project
Employer:
General Directorate of Provincial Bank
Completion Date:
30.04.2019
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
Inlet and bypass structure of treatment plant with 80.000 m³/day capacity, coarse grating and elevation center, flowmeter structure at the plant intake, distribution structure 1, fine grate and pre-treatment units for sand-grease trap, distrbution structure 2, biophosphorus structure, oxidation basin, distribution structure 3, final sedimentation basins, UV structure, outlet flowmeter structure, discharge structure, 1600 mm. discharge line, site organization and roads, site piping, sludge building, blower buildings, administrative building, workshops, laboratory, solar drying structure, transformer and generator building and fittings, watchman building, mechanical and electrical works, and operation of wastewater treatment plant.
[su_custom_gallery source=”media: 533,534,535,536,532″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
Keles (Bursa) Sewerage and Rainwater Construction Project
Description of Project
Employer:
General Directorate of Provincial Bank
Completion Date:
26.07.2018
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
Ø300-400-500-600-800-1000 mm 13.786,90 m sewerage and rainwater line, 889 manholes, 128,09 m stream crossings, 67,48 m horizontal drilling, 800 parcel stacks, 4000 m parcel line, 634 x Ø200-300 rain inlet stacks, 130 x type grates, Ø200-300 7.506,88 m rainwater pipe line Total : 21.293,78 m sewerage and rainwater construction project
[su_custom_gallery source=”media: 928,929,930,931,932″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
Additional Construction of Emergency Border Physical Security System on the Border Line of Hatay City, Yayladağı District (DaÄŸardı – Kayapınar) and Altınözü District, and Construction of Wire Fence on the Gaziantep ve Kilis Border Line
Description of Project
Employer:
Housing Development Administration of Turkey-TOKİ
Completion Date:
26.06.2018
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
Construction of 14.182 m road, 1.320.000 m³ excavation, construction of 14.182 m prefabricated wall, razor wire 3*3 on 14.182 m prefabricated wall, 4.700 m transire service road, 2 ballistic security doors
[su_custom_gallery source=”media: 766,765,764,763,762,761″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
Construction of Channel Tokat Project
Description of Project
Employer:
Municipality of Tokat
Completion Date:
15.11.2017
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
Isolation of stream, installation of rubber dam, ferroconcrete gravel crossing and regulator building, construction of levee
[su_custom_gallery source=”media: 884,885,887,889″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
Improvement of Stream running through Osmaniye Düziçi Ellek Area and Yazlamazlı Village – Section I (Yıldızlar,OÄŸmaca,Keklik, Mamo)
Description of Project
Employer:
DSİ 6th Regional Directorate, ADANA
Completion Date:
14.08.2017
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
10240 m Masonry Wall, 5120 m Grouted Riprap, 19 Culverts, 307200 kg Guardrail and Development of Detailed As-Built Design
[su_custom_gallery source=”media: 507″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
Construction of Wall for installation of High-Security Wire Fence on Various Locations along the Syrian Line
Description of Project
Employer:
Investment Monitoring and Coordination Department of Hatay Governorate (YİKOB)
Completion Date:
09.08.2017
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
12.800 concrete blocks in 2.50 m long and 1.00 m height, pouring of 3.200 m³ C16/20 concrete, ferroconcrete formwork with 6.400 m² plywood
[su_custom_gallery source=”media: 774,773,772″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
Construction of Emergency Border Physical Security System on the Border Line Section 1, Phase 2 in Akçakale District, Şanlıurfa
Description of Project
Employer:
Housing Development Administration of Turkey-TOKİ
Completion Date:
25.05.2017
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
Construction of 18.300 m road, 75.200 m³ excavation, construction of 18.300 mt prefabricated wall 3*3
Razor wire on 18.300 m prefabricated wall, 1.745 m transire service road, 2 ballistic security door
[su_custom_gallery source=”media: 779,778,777″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
Construction of Emergency Border Physical Security System on the Border Line in Hatay City, Yayladağı District (Hamuttepe-Dağardı-Kayapınar)
Description of Project
Employer:
Housing Development Administration of Turkey-TOKİ
Completion Date:
11.04.2017
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
Construction of 12.340 m, 443.200 m³ excavation, construction of 12.340 m prefabricated wall 3*3, razor wire on 12.340 m prefabricated wall, 3.550 m transire service road, 1 ballistic security door
[su_custom_gallery source=”media: 784,783,782,781″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
Maintenance and Repair of Main Streets and Streets within the border of İzmir
Description of Project
Employer:
İzmir Metropolitan Municipality, Concrete Asphalt Power Generation and Distribution Facilities, Water and Sewerage Trading and Industry Co., (İZBETON)
Completion Date:
9.03.2017
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
22000 m³ C20/25 Ready-mixed Concrete,Crushing of 16000 m³ Concrete Road, Installation of 90000 m Pedestrian Curbs, 165000 m² Surface Hard.Helicopter Polishing, 23200 m² 40x40x3,7cm. Tile Plate, Trace, Direction Change, Surface Flooring, 33000 kg. Galvanized Lighting Pole, 5000m., 3″ Welded Galvanized Pipe
[su_custom_gallery source=”media: 787,786″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
Construction of Emergency Border Physical Security System on the Border Line of Şanlıurfa City, Ceylanpınar District
Description of Project
Employer:
Housing Development Administration of Turkey-TOKİ
Completion Date:
7.03.2017
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
Construction of 30.132 m road, 82.200m³ excavation construction of 30.132 m prefabricated wall 3*3, razor wire on 30.132 m prefabricated wall, 928 m transire service road, 3 ballistic security doors
[su_custom_gallery source=”media: 777,778″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
Maintenance and repair of main streets and streets in 3rd Zone of Izmir
Description of Project
Employer:
İzmir Metropolitan Municipality, Concrete Asphalt Power Generation and Distribution Facilities, Water and Sewerage Trading and Industry Co., (İZBETON)
Completion Date:
5.09.2016
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
33.200 m³ ready-mixed concrete, 197.000 m² Site Concrete Surface Hard Helicopter Polishing, Installation of 125.000 m pedestrian curbs, 38.000 m² guides, Trace Direction Change and Warning Surface Flooring, 240.807 m 110 mm Cable Protection Tube, Mechanical Installation and Electrical Works
[su_custom_gallery source=”media: 786″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
Construction of inflatable rubber channel and water accumulation structure
Description of Project
Employer:
Bursa Metropolitan Municipality
Completion Date:
16.11.2015
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
Isolation of stream, installation of rubber dam, ferroconcrete gravel crossing and regulator building, construction of levee
[su_custom_gallery source=”media: 755,754,753,752″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
Antakya Yayladağı Ayr. Altınözü Road (between Sofular and Enek) between Km: 0+000 – 5+378,46, earth works, engineering structures and superstructure) Project
Description of Project
Employer:
Investment Monitoring and Coordination Department of Hatay Governorate (YİKOB)
Completion Date:
1.11.2014
[su_spoiler title=”Detayı görmek için tıklayınız” style=”fancy” icon=”chevron”]
Road width: 11mi, 4 m central refuge, 5 km double-line road construction
[su_custom_gallery source=”media: 468″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
Hatay Airport, Construction of Slurry Trench Project
Description of Project
Employer:
General Directorate of DHMİ (State Airports Administration)
Completion Date:
28.08.2014
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
Overflow protection, slurry trench and insulation works, construction of wire fence, construction of asphalt-covered road
[su_custom_gallery source=”media: 797,795,794″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
Converting Taxiway into Runway in Milas-Bodrum Airport, and Construction of Quick TaxiwayÂ
Description of Project
Employer:
General Directorate of DHMİ
Completion Date:
31.12.2013
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
Construction of 90.000 m² Concrete-Covered Runway
[su_custom_gallery source=”media: 802,800,799″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
Construction of Hatay Technical Block and Tower ProjectÂ
Description of Project
Employer:
General Directorate of DHMİ
Completion Date:
21.12.2013
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
2000 m² excavation, 1200 m³ concrete, 240 ton of iron, 2600 m piles, 5500 m² formwork, 235 ton steel construction, 1926 m² isolation, 2600 m² cutting, 1200 m² landscaping, 1200 m2 carpark concrete
[su_custom_gallery source=”media: 472,471,470″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
Construction of Concrete Asphalt Covering on various main streets of the city Â
Description of Project
Employer:
Technical Works Department of Hatay Metropolitan Municipality
Completion Date:
5.11.2013
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
Supply of 45.873,92 ton hot mixed asphalt, installation and compression, removal of any type of bitumen-mixed asphalt of 8.400.000 m³ using asphalt milling machine, 8.400.000 ton PMT installation and compression work
[su_custom_gallery source=”media: 807,805″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
Construction of Iraq Süleymaniye Rehabilitation CenterÂ
Description of Project
Employer:
Northern Iraq Regional Management, Council of Ministers, Ministry of Building and Development, Department of Development and Improvement, Construction and Development Directorate
Completion Date:
15.09.2013
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
In this project carried out with Kur İnşaat Corp., 49.500 m² construction area and 10.000 m² outdoor sports sites and tartan track, 33.000 m² asphalt and 28.000 m² hardscape and 5.000 m² green landscape. In total, 5 km rainwater and sewerage infrastructure line has been completed.
[su_custom_gallery source=”media: 813,811,810,809″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
Expanding of Apron and Standardization of Strip Sites in Hatay AirportÂ
Description of Project
Employer:
General Directorate of DHMİ
Completion Date:
25.11.2012
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
1.382.000 m³ quality concrete works: 40 cm, 40.000 m², plane concrete works: 10 cm, 40.000 m², Crushed technical filler: 301.504 m³, Earth excavation: 356.700 m³
[su_custom_gallery source=”media: 818,817,816,815″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
Construction of Beykonak (Antalya) Sewearge
Description of Project
Employer:
General Directorate of Provincial Bank
Completion Date:
28.11.2012
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
Ø1200 collector line, Ø800, Ø600, Ø500, Ø400 collector lines, Ø300, Ø200 network lines, and Ø150 parcel stacks connection lines, in this project construction of elevation center and elevation line. As pat of the tender, construction of 42.500 m sewerage has been completed.
[su_custom_gallery source=”media: 824,823,822,821″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
Improvement of 7800 Hectare in RakkaÂ
Description of Project
Employer:
Syrian Ministry of Irrigation, Water Projects General Company
Completion Date:
30.01.2012
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
ǿ350-400-500-600-700-800-900-1000-1200-1400: 73.000 m CTP pipe installation
[su_custom_gallery source=”media: 826,827″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
Wall Injection for Khan – Toman II Dam
Description of Project
Employer:
Syrian Ministry of Irrigation, Water Projects General Company
Completion Date:
10.01.2012
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
Clay-core rock filling. Body Height: 34,38 m., Crest Length: 6 618,37 m., Body Volume: 6 000 000 m³, Crest Width: 10 mt., Area of Lake: 1100 He, Area of Reservoir: 68 million m³, Total Wall Injection: 410.000 m., Irrigation Area: 21 000 He, Crest Upper Level: 343 mt., Max. Water Level: 341 m
[su_custom_gallery source=”media: 845,844,843,842″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
Construction of Sewerage and Rainwater
Description of Project
Employer:
Denizciler Municipality
Completion Date:
16.01.2008
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
This project included sewerage works, rainwater works, parcel connections, manholes, parcel stacks, Ç¿ 200-300-400-600-800 concrete pipes. Total: 43.200 m
[su_custom_gallery source=”media: 840,839,838″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
Construction of Sewerage Network and Domestic Connections in Konyaaltı AreaÂ
Description of Project
Employer:
General Directorate of Antalya Metropolitan Municipality (ASAT)
Completion Date:
10.10.2011
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
ǿ200-ǿ600 mm HDPE corrugated pipes and sewerage network and collector lines and domestic connection works
[su_custom_gallery source=”media: 848″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
Improvement of EskiÅŸehir Airport PAT Sites Project
Description of Project
Employer:
General Directorate of Transportation Infrastructure Investmens
Completion Date:
3.10.2011
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
Infrastructure Excavation-Filling, Concrete-Covered Runway, Asphalt-Coated Runway, CAT-1, Lighting System and ILS System construction techniques and improvement of PAT sites
[su_custom_gallery source=”media: 850,891″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
Construction of Reyhanlı (Hatay) Sewerage – Section II
Description of Project
Employer:
General Directorate of Provincial Bank
Completion Date:
20.07.2009
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
In this project, network and collector lines and manholes, parcel stacks and connections and complete as-built design have been applied. ǿ200-300-400-500-150 Steam Cured Concrete Pipe Installation. Total: 146,300,000 m
[su_custom_gallery source=”media: 854,853,852″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
KahramanmaraÅŸ Central District, Asphalt Surface Covering Work
Description of Project
Employer:
Governorate of KahramanmaraÅŸ
Completion Date:
10.11.2006
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
The base foundation required for infrastructure of 247 km road, supply and transportation of foundation materials, and grading and compression works
[su_custom_gallery source=”media: 863,862,861″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
In ASAT W13/A44 Konyaaltı, Construction of Sewerage Network and Domestic Connections
Description of Project
Employer:
Antalya Metropolitan Municipality, General Directorate of Water and Wastewater Administration (ASAT)
Completion Date:
10.10.2011
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
ǿ200-ǿ600 mm HDPE corrugated pipes and sewerage network and collector lines, and domestic connection works
[su_custom_gallery source=”media: 848″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]

Project Title
Adapazarı (Central) Karamanköy Section I, 3rd Region, Permanent Housings Technical Infrastructure Construction
Description of Project
Employer:
General Directorate of Provincial Bank
Completion Date:
5.08.2002
[su_spoiler title=”Details” style=”fancy” icon=”chevron”]
50.000 m³ excavation, 45.000 m sewerage and rainwater, construction of 300.000 m² paved road, 35.000 m concrete asphalt (double rpad) and road lighting construction, construction of 40.000 m potable water (main collector, secondary connection), 175.000 m² sodding, 45.000 landscape plants and treeplanting works
[su_custom_gallery source=”media: 866,865″ link=”lightbox” width=”250″ height=”140″]
[/su_spoiler]
Construction of 200 km Water Supply Network in Hatay Samandağı Area
Employer: Hatay Water and Sewerage Administration (with EBRD loan)
Date of Contract: 19.03.2019